When the pile driver suddenly tilted and misplaced during the construction of the pile driver, and at the same time the pile hammer jumped up and the pile body rebounded, the construction had to be stopped.
There are several reasons for the fracture of the pile body during the construction of the pile driver:
1. When encountering relatively hard ground or obstacles, the pile body will break if it cannot withstand the bending strength;
2. The pile is not vertical enough when it has been driven into a certain depth, and then corrected after it has been driven into a certain depth, the pile body will be bent, or the vertical deviation will be too large when drilling. During the pile sinking process, it will follow the deviation of the verticality. Sinking, causing the pile to bend;
3. When the length is not long enough, multi-section piles will be used for construction, and the two piles connected to each other are not welded on the same axis, and bending and twists occur;
4. The pile body is subjected to tensile stress during repeated blows of the pile driver. When the tensile stress exceeds the load, the pile body will fracture laterally;
5. There are a lot of debris in the sand and stone, and the strength of the pile body is not enough, and it will break in the weak place during construction;
6. There are other reasons. The strength of the pile body concrete is not enough, or the pile tip of a certain part of the pile body is unevenly soft and hard, which will cause tilt and bend.
Now that the reason is known, how can we avoid the occurrence of breakage? What should I do if the pile body breaks?
Before the construction of the pile driver, clear the obstacles and check the quality of the pile body. The slenderness ratio of a pile should not exceed 30. Do not use the bent pile body; if it is found to be not vertical during construction, it should be corrected in time, or Pull out directly. Once severely tilted, operate strictly as required to ensure that the two piles are on the same axis; adopt the "pile planting method", and the vertical deviation should be controlled within 1%. When deviations occur, do not use moving pile holders to correct them. Avoid bending of the pile body;
The pile body must be operated in accordance with relevant regulations during transportation and storage, and cracked piles must not be used. When encountering more complex geology, geological exploration holes can be encrypted to take effective measures.
Related News
-

What is the use of photovoltaic pile driver? What kind of environment is suitable
It was originally designed as a pre-piling equipment for photovoltaic power plants. Through research and development and upgrading, it can also be used in piling projects such as farms, pastures, and orchards. -

What are the characteristics and advantages of photovoltaic pile drivers?
The machine was originally developed for building solar power plants, but it can also be used in other areas, such as building new roads by securing road safety barriers by piling. -

Features and uses of photovoltaic pile drivers
Introduction to the characteristics and uses of photovoltaic pile drivers. When it comes to photovoltaic pile drivers, you may not know much about them. Below I will give you a brief introduction to photovoltaic pile drivers and the populari -

What are the characteristics of pneumatic drilling rigs? What are the advantages?
Pneumatic well drilling equipment, strong horsepower, fast drilling and fast water output. -

What are the characteristics and functions of air drills?
It is widely used in drilling water wells, detection wells, precipitation wells, rescue wells, ground source air conditioning holes, coal bed methane, natural gas, oil exploration and other projects.